Oversize Transport Permits
🚛 Oversize & Overweight Permits

Oversize Transport Permits

From single-trip permits to superload engineering review — Titanways handles every oversize and overweight permit across Canada and the USA.

Get a Quote arrow_forward call Call Now
Oversize & Overweight

Single-Trip Oversize Permit

A single-trip permit authorizes one specific oversize or overweight load to travel a defined route within a set validity window — typically a few days. It's the most common permit type for one-off heavy hauls.

timer
Processing Time
Same-day to 48 hrs
attach_money
Typical Fee
$25–$150
calendar_today
Validity
3–10 days

Canada Single-Trip Oversize Permits

Each Canadian province issues its own single-trip oversize/overweight permit, valid for one specific move on a defined route. Requirements and fees vary significantly by province.

  • Alberta: Issued by Alberta Transportation; permits up to 3.2m wide processed same-day
  • Ontario: MTO single-trip permits; superload review required above 140,000 kg
  • British Columbia: Online permit system through OBCPS; route-specific restrictions for mountain passes
  • Saskatchewan / Manitoba: Standard dimension permits processed within 24–48 hours

Documents We Prepare

  • Vehicle and load dimension sheet (length, width, height, weight, axle spacing)
  • Route plan with bridge clearance confirmation
  • Insurance certificate and carrier safety fitness certificate

USA Single-Trip Oversize Permits

Each of the 48 contiguous states issues its own single-trip permit through its DOT or equivalent agency. Titanways files simultaneously across all states on your route.

  • Texas: TxDMV permits processed online, typically same-day for standard dimensions
  • California: Caltrans permits with stricter bridge formula compliance checks
  • Multi-state corridors: We file each state permit in parallel so your route is cleared end-to-end before departure

Common Restrictions

  • Daylight-only travel in most states for loads over legal width
  • Weekend and holiday travel restrictions vary by state
  • Mandatory pilot car escorts above certain width/length thresholds

Cross-Border Single-Trip Coordination

When your route crosses the Canada–USA border, we coordinate Canadian provincial permits and U.S. state permits as one synchronized package — so your load is legal on both sides before it leaves the yard.

  • Matched permit validity windows across both countries
  • Coordinated pilot car handoff at the border crossing
  • Pre-cleared customs documentation to avoid border delays

When You Need a Single-Trip Permit

  • Your load exceeds standard legal dimensions or weight for the jurisdiction
  • You're making a one-time move and don't need recurring permit coverage
  • Your route crosses multiple provinces or states with different requirements

What We Handle

1

Dimension & Weight Review

We confirm exact load specs against each jurisdiction's legal limits and bridge formula.

2

Route Survey

We map your route against known clearance restrictions, weight-limited bridges, and construction zones.

3

Permit Filing

We submit to every jurisdiction on your route simultaneously through DOT/MTO portals.

4

Digital Delivery

Approved permits are sent directly to your driver's mobile device before departure.

Apply Now arrow_forward Get a Quote
Oversize & Overweight

Annual / Blanket Permit

An annual (blanket) permit covers unlimited trips within specified dimension and weight limits for a full 12-month period — ideal for carriers who haul oversize loads regularly rather than as a one-off.

timer
Processing Time
1–3 weeks
attach_money
Typical Fee
$300–$1,500/yr
calendar_today
Validity
12 months

Canada Annual Permits

Most provinces offer annual permits for carriers who regularly haul oversize loads within standard dimension ranges — eliminating the need to file a new permit for every trip.

  • Alberta, Ontario, and BC all offer 12-month annual permits for standard oversize configurations
  • Typically covers width up to 3.2–3.7m and length up to 25m depending on province
  • Renewal reminders managed by Titanways so coverage never lapses

USA Annual / Blanket Permits

Many states offer annual blanket permits for carriers with consistent oversize hauling needs, valid for unlimited trips within specified dimension limits for 12 months.

  • Significant cost savings for carriers making 10+ oversize trips per year
  • Available in most states for widths up to 12 feet and heights up to 14 feet
  • State-specific blanket permits do not cover superloads — those still require single-trip filing

Cross-Border Blanket Coverage

For carriers regularly crossing the border with similar load profiles, we coordinate matching annual permits in both countries so you're covered continuously without per-trip filing on either side.

Who Should Get an Annual Permit

  • Carriers making 10+ oversize trips per year within similar dimension ranges
  • Companies hauling standard equipment (modular homes, ag equipment, construction machinery) regularly
  • Fleets wanting to eliminate per-trip permit administration

Coverage Limits

Annual permits typically cover standard oversize configurations only — they do not cover superloads, loads requiring special routing, or moves through restricted corridors. We assess your typical load profile to confirm whether annual coverage fits.

Renewal Management

  • We track your permit expiry and begin renewal 30 days in advance
  • Automatic re-verification of your fleet's vehicle registrations and insurance
  • No coverage gaps between permit periods
Apply Now arrow_forward Get a Quote
Oversize & Overweight

Superload Permit

Superloads are the largest and heaviest category of oversize shipments — typically exceeding standard width, weight, or length thresholds significantly enough to require individual engineering review of every bridge and structure on the route.

timer
Processing Time
1–3 weeks
attach_money
Typical Fee
$200–$2,000+
calendar_today
Validity
Single trip

Canada Superload Permits

Loads exceeding a province's standard oversize thresholds (typically above 3.7m wide, 75,000+ kg, or requiring structural bridge analysis) are classified as superloads and require enhanced review.

  • Engineering review of bridge capacity along the entire route
  • Mandatory pilot car and sometimes police escort
  • Specific travel windows (often night-only or weekend-only)

USA Superload Permits

Superloads in the U.S. (commonly 16+ feet wide, 150,000+ lbs, or requiring multiple bridge analyses) require state engineering review before approval — often taking 1–3 weeks.

  • State bridge engineers must approve the specific route
  • Multi-axle trailer configurations reviewed individually
  • Some states require a structural engineer's stamped analysis for very heavy loads

Cross-Border Superload Coordination

Superloads crossing the border require synchronized engineering approval on both sides plus coordinated escort handoff. We manage the full timeline so neither country's approval delays the other.

What Qualifies as a Superload

  • Width typically over 14–16 feet (varies by jurisdiction)
  • Weight typically over 150,000–200,000 lbs gross
  • Length exceeding standard combination limits
  • Any load requiring structural bridge analysis beyond standard formulas

The Superload Process

1

Route & Structure Analysis

Every bridge, overpass, and weight-restricted structure on the proposed route is individually analyzed for capacity.

2

Engineering Review

State/provincial bridge engineers review and approve (or request route modification) based on the structural analysis.

3

Escort Planning

We coordinate required pilot cars, high-pole vehicles, and police escorts based on jurisdiction requirements.

4

Travel Window Confirmation

Superloads are often restricted to specific hours (commonly overnight) — we confirm and communicate exact windows to your dispatch.

Apply Now arrow_forward Get a Quote
Oversize & Overweight

Overweight Permit

An overweight permit authorizes a vehicle and load combination exceeding standard legal gross or axle weight limits to travel a specific route — required whenever a shipment's weight, not its physical dimensions, is the limiting factor.

timer
Processing Time
Same-day to 1 week
attach_money
Typical Fee
$30–$300
calendar_today
Validity
Single trip or annual

Canada Overweight Permits

Overweight permits in Canada are governed by each province's axle weight and gross vehicle weight regulations, with seasonal restrictions common in spring (frost law / reduced load periods).

  • Spring weight restrictions apply in many provinces March–May, reducing legal axle weights by up to 50%
  • Permits issued based on axle spacing and configuration, not just total weight
  • Some provinces require bridge formula compliance certificates for heavier loads

USA Overweight Permits

U.S. states apply the Federal Bridge Formula to determine maximum legal weight based on axle spacing — overweight permits authorize loads exceeding these limits on specific routes.

  • Interstate highways have stricter weight limits than state highways in most states
  • Some states offer overweight permits only for non-divisible loads (cannot be broken into smaller shipments)
  • Annual overweight permits available in many states for agricultural and certain industrial loads

Cross-Border Overweight Coordination

Weight limits and bridge formulas differ between Canada and the U.S. We recalculate your load's compliance against both countries' formulas before filing, preventing rejected permits at the border.

Understanding the Bridge Formula

Both Canada and the U.S. use a bridge formula to calculate the maximum weight a given axle configuration can legally carry — spreading weight over more axles and greater spacing increases the legal limit. Our specialists calculate your exact compliant weight before filing.

Seasonal Weight Restrictions

  • Spring frost law periods reduce legal axle weights in many northern jurisdictions
  • Restrictions typically last 4–8 weeks depending on weather and road conditions
  • We track active restrictions in your operating region and flag affected routes before you dispatch

Documents Required

  • Vehicle specification sheet with axle spacing diagram
  • Certified scale weight ticket for the loaded vehicle
  • Route plan identifying all weight-restricted structures
Apply Now arrow_forward Get a Quote
Oversize & Overweight

Wide Load Permit

A wide load permit specifically authorizes loads exceeding standard legal width — the most common oversize permit type, required for everything from modular buildings to industrial equipment and pre-fabricated structures.

timer
Processing Time
Same-day to 48 hrs
attach_money
Typical Fee
$25–$200
calendar_today
Validity
3–10 days

Canada Wide Load Requirements

Width-specific permits in Canada typically trigger additional requirements at 2.6m (standard legal width) and again at higher thresholds requiring escort vehicles.

  • 2.6m–3.2m: Standard oversize permit, signage required
  • 3.2m–3.7m: Pilot car required in most provinces
  • Over 3.7m: Police escort may be required depending on route and province

USA Wide Load Requirements

Width restrictions and escort requirements vary by state but generally follow similar thresholds at 8.5ft (legal), 12ft, and 14ft+ for escort requirements.

  • 8.5ft–12ft: Standard oversize permit with flags and signage
  • 12ft–16ft: Pilot car(s) required, often front and rear
  • Over 16ft: Police escort frequently required, route survey mandatory

Cross-Border Wide Load Coordination

Escort requirements differ between Canada and the U.S. at the same width — we ensure your pilot car arrangement satisfies both countries' rules for the full route.

Signage & Flagging Requirements

  • "Wide Load" or "Oversize Load" signage mandatory on front and rear of load
  • Red or orange flags at the widest points of the load
  • Amber warning lights required for travel during reduced visibility

Pilot Car Requirements by Width

Most jurisdictions require a lead pilot car once width exceeds roughly 12 feet, and both lead and rear escorts above 14–16 feet. Titanways coordinates licensed pilot car operators as part of your permit package.

Route Restrictions for Wide Loads

  • Narrow bridges, tunnels, and urban corridors are commonly excluded from approved routes
  • Construction zones may require advance notice to the relevant DOT
  • Some jurisdictions restrict wide load travel during peak traffic hours
Apply Now arrow_forward Get a Quote
Route & Escort Services

Route Survey & Planning

Before any oversize or overweight load departs, a thorough route survey identifies every clearance restriction, weight-limited structure, and construction zone along the path — preventing costly mid-route surprises.

timer
Processing Time
2–5 business days
attach_money
Typical Fee
$150–$800
route
Coverage
Any route, any jurisdiction

What a Route Survey Covers

  • Bridge and overpass clearance heights along the entire route
  • Weight-restricted bridges and their posted limits
  • Construction zones and lane closures affecting wide-load passage
  • Low utility lines, traffic signals, or signage that may obstruct tall loads
  • Turning radius analysis at tight intersections for long combinations

When a Physical Survey Is Required

For exceptionally tall, wide, or heavy loads — especially superloads — a physical drive-through survey by a route surveyor may be required in addition to desktop analysis, particularly for routes through urban areas or mountain passes.

Titanways Route Planning Process

1

Desktop Analysis

We cross-reference your load dimensions against DOT/MTO clearance and weight databases for the proposed route.

2

Alternate Route Modeling

If restrictions are found, we model alternate routes and compare total distance/time impact.

3

Physical Survey (if required)

For superloads, a surveyor physically drives the route confirming real-world clearances.

4

Final Route Package

You receive a turn-by-turn route package with all clearances confirmed, ready for permit filing.

Apply Now arrow_forward Get a Quote
Route & Escort Services

Pilot Car / Escort Coordination

Pilot cars (escort vehicles) are required for most oversize loads beyond standard dimension thresholds. Titanways coordinates licensed, insured pilot car operators matched to your route and jurisdiction requirements.

timer
Processing Time
24–72 hrs notice
attach_money
Typical Fee
$1.50–$3/mile
local_shipping
Coverage
Front, rear & high-pole

Types of Escort Vehicles

  • Lead (Front) Pilot Car: Travels ahead to warn oncoming traffic and identify hazards
  • Rear Pilot Car: Follows behind, manages following traffic and lane changes
  • High-Pole Vehicle: Equipped with a pole matching load height to detect overhead obstructions before the load reaches them
  • Police Escort: Required by some jurisdictions for superloads or travel through specific urban corridors

When Escorts Are Required

Requirements vary by jurisdiction and load dimensions, but generally:

  • Width 12–14ft: single pilot car (front or rear depending on jurisdiction)
  • Width 14ft+: front and rear pilot cars
  • Height over legal limit: high-pole vehicle required
  • Superloads: police escort frequently mandatory, especially through urban areas

Titanways Escort Network

  • Licensed, certified pilot car operators across Canada and the U.S.
  • Coordinated scheduling matched to your departure window
  • Cross-border escort handoff coordination at the border crossing
  • Real-time communication between escorts and your driver throughout the move
Apply Now arrow_forward Get a Quote
Route & Escort Services

Bridge Formula Analysis

The Bridge Formula determines the maximum weight a vehicle combination can legally carry based on axle count and spacing. Accurate analysis prevents permit rejections and ensures your configuration is genuinely road-legal.

timer
Processing Time
1–3 business days
attach_money
Typical Fee
$100–$500
calculate
Standard
Federal Bridge Formula B

What the Bridge Formula Calculates

The formula balances total vehicle weight against the distance between the first and last axle of any group, and the number of axles in that group — more axles spread over greater distance allows more total weight, protecting bridges from concentrated stress.

Why This Matters for Permitting

  • A load may be under the simple gross weight limit but still violate bridge formula limits for its specific axle configuration
  • Permit applications are commonly rejected when axle spacing isn't optimized for the load weight
  • Reconfiguring axle spacing (even slightly) can sometimes legalize a load without needing a superload permit

How Titanways Helps

1

Configuration Review

We map your exact trailer axle group spacing and weight distribution.

2

Formula Calculation

We run the bridge formula against both Canadian and U.S. standards depending on your route.

3

Optimization Recommendations

If your configuration doesn't comply, we recommend axle spacing or weight redistribution adjustments.

Apply Now arrow_forward Get a Quote
Route & Escort Services

Night Haul / Restricted Hours Permit

Many superloads and very wide loads are restricted to specific travel windows — commonly overnight or weekend hours — to minimize traffic disruption and improve safety. Titanways coordinates the scheduling and authorization for restricted-hours travel.

timer
Processing Time
Included in permit filing
attach_money
Typical Fee
No extra fee
schedule
Common Windows
10pm–6am, weekends

Why Travel Windows Are Restricted

  • Reduced traffic volume minimizes congestion and safety risk for oversize loads
  • Lower visibility periods may have additional lighting requirements
  • Urban corridors often prohibit wide-load travel during rush hour entirely

Common Restricted Hours by Load Type

  • Standard oversize: Daylight hours only, typically 30 min after sunrise to 30 min before sunset
  • Superloads: Often restricted to specific overnight windows (e.g., 9pm–5am) to avoid daytime traffic
  • Urban corridor moves: May only be authorized for early Sunday morning hours when traffic is lowest

What We Coordinate

  • Confirmation of exact authorized travel windows for your specific route and load
  • Lighting and signage requirements specific to night travel
  • Coordination with police escorts for urban night moves where required
  • Communication of exact windows to your dispatch and driver well in advance
Apply Now arrow_forward Get a Quote
Get in Touch

Ready to Move Your Load?

Tell us about your shipment. We respond within one business hour with a quote and timeline.

Talk to a Permit Specialist

Our permit desk is staffed Mon–Fri 7am–7pm MT with a 24/7 emergency line for urgent moves.

schedule
Hours
Mon–Fri 7am–7pm MT
Emergency line 24/7
chat
CVOR CertifiedNSC CompliantDOT RegisteredFAST Approved
bolt 1-Hour Response Guarantee

Every quote request is answered within one business hour — or sooner for our 24/7 emergency line.

Request a Permit Quote

lock Your information is private and never shared with third parties.

check_circleMessage sent!